Request a Quote

Payment, samples, warranty and the order sequence, stated up front. Most of what a buyer needs to know before sending a first enquiry is on this page — no back-and-forth required.

30%
T/T deposit to start production
70%
balance before shipment
12 mo
warranty, failed parts replaced
500
pcs MOQ on fountain and feeder lines

Payment

Two instalments, by T/T.

Stage Share What it covers
Deposit 30% Paid to release the order into production. Covers raw material, mould time and the production slot.
Balance 70% Paid once the goods are produced and inspected, before the container leaves the factory.

Bank details are issued on the proforma invoice with the company name and account name matching. If you receive payment instructions from a different account, stop and call the number on this site before transferring anything.

We do not change bank details by email. Any message asking you to pay into a new account should be treated as fraud, even if it appears to come from us.

Samples

Samples are available before a bulk order, on any standard model.

  • You pay the sample cost and the freight to your address.
  • The sample cost is refunded against your bulk order — it is deducted from the invoice, not paid back separately.
  • Freight is not refunded. Courier charges are paid to the carrier and do not come back.
  • Lead time for a standard sample is quoted with the sample invoice; customised samples take longer because the logo or packaging has to be set up first.

Sample units are production units, not hand-built display models. What you test is what the bulk order runs to.

Warranty

Twelve months from the shipment date. If a component fails inside that window, the replacement part is supplied by us and you fit it — the unit is not returned to China.

Covered Not covered
Pump failure Filter cartridges and other consumables
Control board and sensor faults Damage from drops, chewing or incorrect cleaning
Battery that will not hold charge Use outside the rated voltage or with a non-compliant adapter
Heating element failure Damage from hard water scale where the cleaning schedule was not followed

To claim, send the order number, the model code and a short video or photo of the fault. Parts are dispatched with your next shipment where possible, so a single failure does not trigger its own courier cost.

Warranty terms are restated in the sales contract. If your market needs a longer period for retail sale, that is agreed before the order is placed, not after.

How an order runs

01
Enquiry
Send models, quantities and destination port. You get a written FOB quote with carton data.
02
Sample
Sample invoice, payment, dispatch. Test the unit before committing to a bulk order.
03
Deposit
30% T/T against the proforma invoice releases the order into production.
04
Inspection
Goods are produced and checked. Pre-shipment inspection by your agent is welcome.
05
Balance and shipment
70% clears, documents are issued, the container ships.

Trade term and documents

Quotes are FOB Shenzhen or Guangzhou. Freight, insurance and import duty sit with the buyer, arranged through your forwarder or ours.

Each shipment is accompanied by a commercial invoice, packing list, bill of lading and copies of the applicable certification documents. Certificates of origin are issued on request where the destination requires one.

What the unit price does not include

Being explicit here saves a disagreement later:

  • New tooling. A private mould is a separate project cost, quoted on its own, not absorbed into the unit price.
  • Certification testing for a market the model is not already approved for.
  • Freight, insurance and duty.
  • Custom packaging plates where a retail box needs new print setup.

Questions buyers ask before ordering

Is the deposit refundable if I cancel?

The deposit covers material and production time already committed, so it is not refundable once production has started. Before production begins, talk to us — the position depends on how far the order has moved.

Can I pay the balance after the goods arrive?

No. The balance is settled before shipment, which is the standard arrangement for FOB orders. This is also why pre-shipment inspection is welcome — you verify the goods while they are still in our factory.

Do you accept L/C?

Payment is by T/T. If your company requires a letter of credit, raise it before the order is confirmed so it can be assessed against the order value.

What happens if a pump fails six months in?

Send the order number and model code with a short video. A replacement pump is supplied under warranty and ships with your next order where the timing allows.

Can my inspection agent visit before shipment?

Yes. Third-party pre-shipment inspection is welcome, and factory visits can be arranged. Tell us the intended date so the goods are held at the right stage.

Are prices fixed once quoted?

Quotes are held for the validity period stated on the quotation. Component and material costs move, so a quote from six months ago is re-confirmed before it is used.

Ask for a quote with terms attached

Send the models, quantities and destination port. The quote comes back with payment terms, carton data and lead time in writing.

Request a quote

Share:
Request a Quote

Click to Chat.

I'm online now.
Hello! Welcome to HS Smart Pet. Looking for pet water fountains, feeders, or OEM/ODM manufacturing solutions? Let's chat!
WhatsApp Me
HS Smart Pet - OEM ODM Pet Product Manufacturer

Get in Touch for Inquiries or Partnerships